Comprehensive School Neubeckum

Project details

LocationNeubeckum
BuilderCity Beckum
Establishment2016-2017
Gross floor area1.800sqm
Construction costs1,8 mio. €
Power mkBuilding design, structural design, EnEV

In the course of the introduction of the secondary and comprehensive school forms in the Beckum/Neubeckum and Ennigerloh area, the former Hauptschule in Turmstraße in Neubeckum was transferred to the comprehensive school form in cooperation with the city of Ennigerloh.

As a result, additional space was required at the Neubeckum site for six new school classes, as well as for administrative areas. The barrier-free, two-story addition to the existing building creates an additional usable area of approx. 1,500 m2. As a building from the field of education, the design responds to the many sensitive issues involved in planning teaching spaces.

The modern design language of the extension is the result of the detailed elaboration of building law concerns as well as use-specific requirements. The focus is on the functionality and the residential character of the premises. Our range of services for this project includes the entire building and structural design.